Contracted by PBMR, as a Mechanical Design Engineer, to manage the execution of the qualification process on the non-metallic
(Graphite and Carbon Fiber Reinforced Carbon) components of the Reactor Unit Core Structure Ceramics and to assist as one(1)
of a team of six(6) design engineers on the CSC design.
Contracted by M-Tech Industrial, as a Mechanical Design Engineer, to manage the design, fabrication and manufacture,
construction and commissioning of a test facility (High Pressure Test Unit) for the client PBMR. The test unit would be used to
conduct a series of separate effects thermo-hydraulic tests. The results from this test facility will be used to validate
previous data and assumptions for simulation software.
Contracted by BBRIS, as a Mechanical Engineer, to assist with the implementation of a database maintenance system (MIMS )
into the Infrastructure Maintenance Contractor, BBRIS-Great Eastern.
Qualifications:
MBA (Wits Business School) - 2004
B. Eng. Hons (Technology Management) - 1999
B. Eng. (Mechanical) - 1996
Experience:
Contracted Project Manager for development of high-speed Helium blower, graphite characterization project for PBMR and development of
technologically advanced biodiesel plant for M-Tech Industrial. Contracted Project Manager for the M-Tech Industrial Biodiesel
Innovation Fund application.
Contracted Project Manager for the Engineering, Procurement, Construction and Commissioning of the High Pressure Test Unit (HPTU) plant
within the Heat Transfer Test Facility (HTTF). Plant was successfully completed within time and budget on the 15th of August 2006.
Contracted Project Manager for the Concept, Basic and Detail Design of the Heat Transfer Test Facility (HTTF) Project.
The purpose of the HTTF is twofold: To validate the correlations that are currently used to model the relevant heat transfer and fluid
flow phenomena required for the integrated simulation of the pebble bed core, via a comprehensive set of Separate Effects Tests (SET).
To generate results that may be used to validate the different simulation methodologies applied in the integrated models that
represent the entire pebble bed core, via a comprehensive set of Integrated Effects Tests (IET). The Heat Transfer
Facility consists of the High Pressure Test Unit (50bar) and the High Temperature Test Unit (1450°C).
Responsible for pre-proposal for funding for Industrial Plant Simulator, Innovation Fund - NRF. The proposal has been
accepted by the NRF and M-Tech Industrial has started with the project. Also contracted to work as consultant, responsible
to help define and document the software verification and validation processes and procedures for the development of Flownex.
Project manager for the Pebble Bed Micro Model Experimental Facility.
Appointed as General Manager of Coventry Climax Ltd. Coventry Climax focuses on the design, development and
manufacture of specialist equipment for military, marine and aircraft applications.
The Coventry Climax group of companies consists of two entities; Climax Holdings International, which manages and controls
all aspects relating to intellectual property and Coventry Climax Limited which manufactures diesel and petrol engines for
both the commercial and military sectors and which houses the group's engineering analysis and design capability.
Contracted through M-Tech to work on PBMR (Pebble Bed Modular Reactor) Project. Working as Technical Project Coordinator
for PSAG (Plant Simulation & Analysis Group) - assisting PSAG Manager with general management, project planning, human resource
sourcing, appointment and management. Project manager for the successful development of an Internet based Deliverable and
Time Management system for PBMR - conceptualization, development and implementation. PSAG was a group of 120 engineers within the
PBMR Engineering team.
- Consulting mechanical engineer/project manager at MMS Technology. Some of the projects completed are:
Engineer in charge of the site and project manager for the refurbishment of the Hot Gas Extraction Duct at Columbus Stainless.
- Project manager for MMS Technology for the redesign, manufacturing and installation of the Replacement Hot Gas Extraction Duct.
Technical consultant to the Columbus Stainless Project Manager. Assisted with the redesign of the system.
- Designed, manufactured and commissioned various support items for the Rooivalk Attack Helicopter Weapons Integration Bench.
- Designed, manufactured and commissioned a man-portable, modular stores handling crane for the Rooivalk Attack Helicopter Weapons
Integration Bench.
- Assistant site-manager for MMS Technology for the refurbishment of Sappi Ngodwana's 1000ton paper press. Project was successfully
completed within severe time and budgetary constraints.
- Project manager for the manufacturing of an in-house developed composite material cricket bat.
- Assist with the design of and manage the manufacturing of prototype composite material rock drill sleeves for the Quiet Self-Thrusting Rock drill.
- Design and manufacturing of high-integrity, high-performance Electronic Warfare Antenna Enclosures for use on the
South African Navy corvettes.